close
+86 13509963615
info@gzhaisan.com
Search
Guangzhou Haisan Amusement Technology Co., Ltd.

Differentiated Positioning is the Key Factor for the Outstanding Water Amusement Park

Differentiated Positioning is the Key Factor for the Outstanding Water Amusement Park

At present, the agglomeration effect of water park projects is becoming more and more obvious, water park projects are blooming everywhere, and various regions are vigorously investing in the construction of water park projects. With this development trends, the water park project needs to stand out, and differentiated positioning is the key factor.


1. A vivid theme concept of the water park project


Water park project is a tourism product that relies on creative themes. If the water park does not have a theme, or a vague theme, it is difficult to attract tourists for a long time. Therefore, the theme of the water park project is very important to choose.


2. Continuously innovative content of the water park project


In order to continue to attract tourists, unique experience model is important. This requires the continuous addition of new water park equipment and service methods, and enhanced leisure and entertainment features to meet the growing and changing needs of visitors.


3. The water park project should focus on tourists


Follow the concept of humanized design, designed to make visitors feel happy. Even overly exciting water park project equipment needs to be considered appropriate to reduce visitors' discomfort.


At the same time, we pay attention to localization, fully considering the unique local culture and needs. And close to the local market, we aim at the design of water park projects.


Related News
  • How to Judge the Water Park Equipment?

    How to Judge the Water Park Equipment?

    January 15, 2018There is a lot of water park equipment manufacturers in the market, when the investors are planing for a water amusement park, to choose water park equipment make them feel comfused. Here Haisan will ...view
  • Water Park Construction Cycle

    Water Park Construction Cycle

    July 6, 2017If we do not consider the time for investor’s approval procedures and if civil engineering and equipment production start at the same time, the construction period of the water park project generally...view
  • How to Overcome Challenges in Operating a Water Park Project?

    How to Overcome Challenges in Operating a Water Park Project?

    April 10, 2023In the operation of a water park project, many investors inevitably encounter difficulties due to poor management. So, how can we get out of trouble and turn a profit in this situation?If the equipmen...view
  • Development Strategies of Water Parks in the Post-epidemic Era

    Development Strategies of Water Parks in the Post-epidemic Era

    April 23, 2021For completed water park projects, how can we deal with the current situation in the post epidemic era?1. Water park project establishes the initial contact with tourists again through brand communica...view
  • Preparation Tips before Opening Water Park

    Preparation Tips before Opening Water Park

    August 28, 2018The operation of a water park can retain visitors and make long-term development or not depends on the satisfaction of tourists which is a very important item. Therefore, to the old and new operators ...view
  • Five tips for successful operation of water park

    Five tips for successful operation of water park

    October 31, 2017At present, the water park market can be described as "ice and snow". "Fire", the water park industry was at a stage of rapid growth, and even the existence of the size of enterprises swarmed the situ...view
Online Servicetq_online