Regulations and Design of Relevant Facilities at the Initial Stage of Water Park Construction

Regulations and Design of Relevant Facilities at the Initial Stage of Water Park Construction

Ⅰ. The design of the pool of the water park project should meet the following requirements


1. The water park project pool should be designed for waterproofing, and technical measures should be taken to avoid sinking, water leakage, cracking and other problems in the pool;


2. The pool body should be equipped with climbing ladders, and the climbing interval should not be greater than 15.0m;


3. Clear and visible water depth signs should be set on the pool wall of the water park project;


4. Anti-collision measures should be taken on the wall of the tsunami pools;


5. A full-length footrest should be set at 1.20m below the water surface of the pool wall, and the width should not be less than 0.15m;


6. An overflow trough should be set on the pool wall, and an overflow grate should be set on the trough; when the overflow trough is used as overflow backwater, it should not be discharged into the dirty water of the pool bank.


7. A lifeguard safety observatory should be set up for every 100 square meters of water surface area, and the height of the safety observatory from the pool bank floor should not be less than 1.20m. The safety observatory should be able to observe the entire recreational water area;


8. The water park project pool should be equipped with emergency drainage facilities. And the drain should take measures to prevent children from inhaling;


9. The edge of the pool should be set to prevent the surrounding rainwater, sewage, etc. from flowing into the pool;


10. The width of the pool bank should not be less than 7.0m, and the angle between the pool bank and the pool body should be rounded;


11. The ground surface material of the pool bank should be non-slip and easy to clean, and a drainage slope should be set.


Ⅱ. Calculation of the number of people in the water park project


1. The maximum number of people in the pool area of the water park project at the same time is calculated as 0.5 people/m.


2. The number of people in the vehicle area should be calculated based on the passenger capacity of the water park equipment.


Ⅲ. Housing and facilities of the water park project


The auxiliary rooms and facilities of the water park project shall comply with the relevant provisions of the current national standards and shall meet the following requirements:


1. The number of changing clothes, showers, toilets and sanitary wares should be determined according to the number of people who should be in accordance with the rated passenger capacity of the amusement pool of the water park project;


2. Before entering the recreational water area, it is mandatory to pass through sanitary facilities such as showers and disinfecting foot baths. The width of the disinfection foot bath should be the same width as the passage leading to the pool, the length of the disinfection foot bath should not be less than 2.0m, and the depth should not be less than 0.20m;


3. Anti-slip measures should be taken on the ground in wet spaces such as walkways, changing rooms, bathrooms and toilets;


4. The technical equipment room of the water park project should include water treatment room, water quality inspection room, water pump room, power distribution room, etc., as well as related computer rooms and warehouses;


5. When using liquid chlorine and other chemicals for water treatment, there should be an independent chlorination room and chemical storage room;


6. Technical measures such as fire prevention, explosion prevention and ventilation shall be adopted in the chlorination room and chemical storage room.


Related News
  • Preparation Tips before Opening Water Park

    Preparation Tips before Opening Water Park

    August 28, 2018The operation of a water park can retain visitors and make long-term development or not depends on the satisfaction of tourists which is a very important item. Therefore, to the old and new operators ...view
  • Will the price of water park equipment be very affordable

    Will the price of water park equipment be very affordable

    September 7, 2017With the rapid development of China's water parks in the past ten years, water parks are almost all over the country and are no longer a novelty to tourists. Thus, the early days of success, as simple...view
  • Tornado Slide

    Tornado Slide

    August 20, 2018Haisan theme park water slides can be your satisfactory choice in summer because there is nothing can beat the heat better than water and fun! The Haisan tornado slide can furnish young people a refre...view
  • Pay Attention to These When Operating a Water Park

    Pay Attention to These When Operating a Water Park

    July 11, 2023Type of Water Amusement Park Equipment Does Not Have to Be MoreThe operating site of the water park is determined, but some investors may think that the more water park equipment, the more attractive ...view
  • How to Choose the Right Water Purification Materials for a Water Park?

    How to Choose the Right Water Purification Materials for a Water Park?

    February 7, 2024Quartz sand filter material, with its excellent performance, can be used as a water park project purification material. After treatment, the water can be reused, greatly reducing the operating cost of...view
  • Water Park Slide Requirements and Types

    Water Park Slide Requirements and Types

    May 26, 2020The design, construction and operation of the water park slide are highly consistent with the park's investors, managers and tourists:First of all, safety is always the first thing. As a special f...view
Online Servicetq_online