Related News
water park planning and design from HAISAN water slide company-part two
March 1, 20191. Functional zoning is clear, scientific, environmentally friendly and rational as HAISAN water slide company mentions Step by step, the functional areas are set up so that tourists can be fully involved and intoxicated. The forest water worlviewOn the design and capital raising of theme park from the perspective of operation-1
March 16, 2020At the beginning of 2020, the outbreak of new coronary pneumonia has led to many theme parks across the country to announce the "closed Park" announcement, which makes it easy to close the door. However, for the operation subject, the pressure can be imagviewWhat are the shortcomings of water parks existed from HAISAN water slide company
April 16, 2019With the rapid development of China's economy and the continuous increase of people's income level, the tertiary industry and the tourism industry continue to mature, and people's consumption concepts are constantly changing.viewSafety first: precautions for the preparation and operation of water park equipment-part one
October 31, 2019Funding requirements for equipment development and construction auxiliary facilities 1. Perimeter safety design requirements for large-scale track water park equipment operation? (1) In order to prevent the vehicle from colliding with the passengersviewwater park builder for theme
July 24, 2019From the moment it was born, water park builder has an irrefutable nature-it is a water equipment project with the basic function of amusement as experience, and the equipment amusement brings inevitable homogenization.viewFour major tips for water park design from HAISAN water park equipment
August 9, 2019The location of the water park equipment from HAISAN should be conveniently located. The park is not the bigger the better. Its size should be determined according to the local achievable passenger flow, consumption level and its own management team. Do nview