Basic process of water park construction

After obtaining the land use right and project approval, carry out:           

(1) Conceptual design planning stage           

1. Select the concept design unit to carry out the docking of the concept design work;            2. Creative theme, story line theme image equipment list floor layout, overall aerial view, equipment outsourcing style, etc.           

(2) Selection stage of water amusement facilities           

1. Select and purchase equipment according to the equipment list provided by conceptual design, and determine the equipment production cycle;           

2. Determine equipment location, floor area and foundation drawings.           

(3) Planning and design stage of water park            

Scheme design:           

1. Interior packaging design of each partition plan, general plan, visitor moving line, traffic route and evacuation route;           

2. Interior landscape design, interior landscape props style design, assist tool props design;          

3. Lighting system design.           

Expansion design indoor packaging design:           

1. Interior landscape design;           

2. Environment art and scene props;           

3. Equipment packaging design;            

4. Lighting system design.           

Construction design:           

Including interior packaging design, landscape design, environmental art and scene props, equipment supporting packaging design, lighting system design, logo system design theme, logo design function logo, etc.

Civil construction stage

According to the planning drawings of the water park, pay special attention to the location of embedded parts, water inlet and outlet, load-bearing structure, etc.

Equipment installation and commissioning           

1. Registration and filing of quality supervision department;           

2. Equipment installation, equipment installation and commissioning;           

3. Amusement equipment acceptance certificate;           

4. Equipment maintenance and operation training.

Recruitment, establishment and training of operation team

1. Establishment of operation management system;           

2. Recruit core management and equipment maintenance personnel before equipment installation and commissioning;           

3. At the later stage of water park equipment installation and commissioning, the amusement equipment operators are in place;           

4. Service etiquette, process training and safety management training;           

5. Operation, maintenance and management personnel obtain corresponding certificates;           

6. Basic knowledge training of amusement equipment, operation emergency drill training, simulation and practical operation training of each post.

Trial operations

1. Employees are familiar with their own work process and service process;           

2. Collect feedback from tourists and upgrade;           

3. In the operation, we found the deficiencies and optimized the process;           

4. Troubleshooting and rectification of potential safety hazards.

Grand Opening

1. Prophase publicity;           

2. Activity arrangement;           

3. Passenger flow safety control;           

4. Crisis public relations drill;           

5. Safety emergency plan;           

6. Preferential policies for opening;           

7. Equipment maintenance and update.           

The preparation and construction of water park is not a simple project preparation and construction, but a process of overall planning, operation and management of the project as a whole.



Related News
  • Facilities and layout of artificial swimming place in water slide design

    Facilities and layout of artificial swimming place in water slide design

    May 20, 2020In the design of the water park, the facilities and layout of the artificial swimming place must meet certain requirements, as follows: 1. The artificially constructed swimming place shall be equipped with swimming pool and emergency room, changing rooview
  • Five misunderstandings in building water park must be avoided!

    Five misunderstandings in building water park must be avoided!

    September 21, 2020There are many operators who have just startedto manage water parks. They will encounter problems of this kind or that whenoperating water park equipment, which will affect their income and makethemse...view
  • Management ideas for Water Park Equipment

    Management ideas for Water Park Equipment

    July 23, 2019For the investors of a water park, the key strategy of investing in a aquatic park project needs to be investigated from all aspects, such as the selection of water park equipment manufacturer, project operation guidance, safety product customization, aftview
  • Iteration and innovation of parent-child leisure-2

    Iteration and innovation of parent-child leisure-2

    April 30, 2020Many theme parks(including water slide) are naturally rich in parent-child elements, such as foreign Disneyland, Lego Park, etc., as well as domestic Fonterra, Chimelong, etc. their product target customers tend to be younger and family, the content of whview
  • Some points for the construction of Water Park Equipment

    Some points for the construction of Water Park Equipment

    August 21, 2019Accidental injuries are the most harmful to tourists' experience. What is the most injured accident? Mainly bruises and scratches, the two main occurrence sites are wave ponds, drifting rivers and roads, the causes of which are related to Water Park Equipview
  • The cost to invest water park equipment

    The cost to invest water park equipment

    September 3, 2019Many customers often ask how much money is needed to invest water park equipment? 1 million? 2 million? 5 million? Or 10 million? In fact, this is a problem with no certain scope. After all, the investment can be large or small, not only related to the siview
Online Servicetq_online